-
Posted: 2010/04/07 | Categories: FAQ
After the marking work, the machine must be cleaned with thinner. If the machine will not be used in a long time, wash the spray gun with engine oil to prevent rusting.
...
-
Posted: 2010/04/06 | Categories: FAQ
Thermoplastic marking costs more than cold solvent marking and it is more complicated to operate. However, its marking lines last much longer than those of cold solvent and suitable for heavy-traffic ...
-
Posted: 2010/04/06 | Categories: FAQ
The main difference of hand push and self propelled machine is application area: self propelled is suitable for ramps and mountain ares while hand push line marking machine is suitable for highway and ...
-
Posted: 2010/04/06 | Categories: FAQ
Yes, all the machine’s color and appearance(including logo) can be customized according to customer requirements. The package of thermoplastic paint, glass beads and resin can also be customized ...
-
Posted: 2010/04/06 | Categories: FAQ
This depends on two factors: line thickness and road surface flatness: In general case, you can mark 250 square meters of lines of 1.6 mm thick and 200 square meters of 1.8 mm thick.
...
-
Posted: 2010/04/06 | Categories: FAQ
Roadsky is able to provide technical support for the entire marking process and can send engineer to the site to guide the construction. However, above service will involve extra charge according to s ...
-
Posted: 2010/04/06 | Categories: FAQ
1.The road must be dry and surface temperature should be above 10℃.
2.A layer of prime must be painted on concrete road and asphalt surfaces in poor condition to improve the adhesion of the thermoplas ...